Groundwater Pumping Regulations
To prevent land subsidence, when installing groundwater pumping facilities (wells), regulations such as structural standards and limits on pumping volume are enforced under the Tokyo Metropolitan Environmental Protection Ordinance, which ensures the health and safety of residents.
In addition, it is mandatory to report the amount of pumped groundwater once a year, including the already installed groundwater pumping facilities.
Installation of Groundwater Pumping Facilities (Wells)
Target Facility
All Pumping Facilities
Note: Only pumping facilities with a pump output exceeding 300 watts are eligible for single-family homes used solely for household purposes.
Structural Standards and Pumping Regulations
Exit opening cross-sectional area | Location of the Strainer | Pump Output | Upper limit of pumping volume |
---|---|---|---|
6 square centimeters or less | No restrictions | 2.2 kilowatts or less | Average of 10 cubic meters per day and Up to 20 cubic meters per day |
Exceeding 6 square centimeters 21 square centimeters or less |
400 meters or deeper | No restrictions | No restrictions |
Over 21 square centimeters | Installation not possible |
Time of Notification
Please submit the installation notification at least 30 days before the start of construction.
- Note: Please contact the Living Environment Division, Environmental Conservation Section in advance when you come to submit your notification.
- Note: A copy of the notification form will generally be returned at a later date. If it is difficult for you to come to the office for the return, it will be sent by mail, so if you wish to have it mailed back, please attach a self-addressed envelope with the necessary postage when submitting the notification.
- Note: Regarding various notification documents, due to the abolition of seals, please make corrections with double lines, etc., in case of any errors in the content.
Documents Required for Notification
- Form No. 36 Notification of Installation (Change) of Groundwater Pumping Facility
- Local Guide Map
- Layout Map
- Well Structure Diagram
- Water Supply System Diagram
- Catalog of Pumping Machines, Flow Meters, and Water Level Gauges
- Geological Column Diagram (Post-Drilling Submission)
- Pumping Test Report (Submitted After Well Drilling)
Number of Copies Submitted
One original and one copy (including attached documents)
Change or Abolition of Groundwater Pumping Facilities (Wells)
Please notify us when changing or abolishing the pumping facility, or when there are changes to the owner's name, address, etc.
- Change of Pumping Facility: Please submit the application for the installation or modification of groundwater pumping facilities (Form No. 36) in accordance with the installation of pumping facilities.
- Abolition of Pumping Facilities: Well Abandonment Report
- Change of Well Owner's Name, etc.: Name Change Report
Groundwater Pumping Volume Report
Pump facility operators should understand the groundwater pumping volume from the previous year and report it once a year.
Target Facility
All Pumping Facilities
Note: For pumping facilities installed after July 2016, only those used for household purposes in single-family homes with a pump output exceeding 300 watts are eligible.
Reporting Period
From January 1 to December 31 of the previous year
Report Details
Monthly groundwater extraction volume, breakdown by usage, etc.
Submitted Documents
Groundwater Pumping Volume Report (Form No. 18)
Submission Period
By the end of January every year
Number of Copies Submitted
Part 2
Form
- Form No. 36 Notification of Installation (Change) of Groundwater Pumping Facility (Word 32.5KB)
- Attachment (Word 45.0KB)
- Well Abandonment Report (Word 31.0KB)
- Name Change Report (Word 31.5KB)
- Form No. 18 Groundwater Pumping Volume Report (Word 38.0KB)
- Groundwater Pumping Record (Word 90.5KB)
Example
Please let us know your feedback on how to make our website better.
Inquiries about this page
Inagi City, Department of Urban Environment and Development, Living Environment Division
2111 Higashi-Naganuma, Inagi City, Tokyo 206-8601
Phone number: 042-378-2111 Fax number: 042-377-4781
Contact the Living Environment Division, Urban Environment Management Department, Inagi City